90 0 tons office building methanol boiler chimney

HVAC Calculations

Estimated Cooling Load (Tons): .25 to .35 tons per 100 square feet of total building area: Estimated Heating Load (MBH): 1.5 to 2.5 MBH per 100 square feet of total building area: Estimated CFM: 75 to 125 cfm per 100 square feet of total building area: Chilled Water GPM: 2.4 gpm per ton of cooling