24 0 tons office building fuel boiler condenser

Energy Cost Savings Calculator for Commercial Boilers ...

Base model - Values represent a 1000000 Btu/hour gas-fired hot-water boiler operated for 1500 full-load hours per year with a thermal efficiency of 80%. The performance of this standard unit is based on ASHRAE 90.1-2007. Thermal efficiency (E t) - Represents a output divided by input as defined by ANSI Z21.13. A thermal efficiency rating should be used to ...

Get A Quote

30WGA - Home Page for Carrier air conditioning heating ...

Nominal cooling capacity : 25-190 kW Nominal heating capacity : 30-230 kW. The 30WG/30WGA units are new Carrier chillers and heat pumps designed for commercial (offices small hotels leisure facilities) residential and industrial applications.

Get A Quote

Boilers: Burnham Weil-McLain Slant/Fin Lochinvar ...

These boilers are often modulating and condensing boilers. The modulation feature allows them to operate at different BTU levels depending upon the amount of heat that is required at a given time (as opposed to a traditional that fires at even if only a small amount of heat is required).

Get A Quote

Commercial Heating and Cooling Products - Rheem ...

Whether youre looking to keep employees productive patients comfortable or heat-sensitive material at optimal temperature Rheem ® commercial heating and cooling products get the job donemaximizing savings and uptime for your business. Rheem offers a wide variety of high-efficiency HVAC products to power your business and we have the specification tools and documentation to keep your ...

Get A Quote

Condenser Water in Commercial Lease | Leasing REality

Apr 17 2017 · Landlord Advocates: If landlord is willing to allow its tenant to have installed at tenants own cost a water cooled supplemental air-conditioning system subject to the capacity of the buildings water tower landlord should limit the amount of tonnage the tenant can receive (e.g. eight (8) to sixteen (16) ). Tenant Counteraction: Either delete the tonnage limit or ...

Get A Quote

Commercial geothermal heating and cooling system design

Nov 01 2008 · For example for a 50000-sq-ft office building with a ground loop sized for the peak heating load of 750000 Btuh (62.5 tons) and 400-ft boreholes: Number of boreholes required = (62.5 x 200 ft of bore/)/400 ft per bore = 31.25 bore holes Cost of boreholes = 62.5 x $1600/

Get A Quote